Sabari Constructions Technology Pvt.Ltd.
Location : Mahalaxmi Mumbai
Duration of project : Fab 2021 To Mar 2021
Total cost of the project : 0.9 Cr.
Mahendra Roots
Location : kandiwali Mumbai
Duration of project: March 2019 to Dec 2019
Total cost of Excavation work: 1.02 Cr.
L&T Construction
Location : Ghodbandar to Charoti Palghar
Duration of project: Jun 2018 to on going.
Total cost of Excavation, Tunnel & blasting work: 5.3 Cr.
L&T STEC JV. Mumbai UGCO7.
Location : Seepz Andheri
Duration of Project: Fab 2020 to Mar 2020
Total cost of Road work : 0.72 Cr.
Godrej & Boys
Location : Vikroli Mumbai
On going painting , powder coating and Grit blasting.